Sample networks
Five ready-made networks in the Start gallery: three Indian teaching networks in metric units and EPANET's own Net1 and Net3, and what each one teaches.
Open the gallery with File > Start / Sample Networks.... Click a card to open that network. If the open project has unsaved changes, PipePilot asks before replacing it. Opening a sample also sets the defaults for new objects to match its units, so a pipe you add to a metric sample is 150 mm, not 12 mm.
ESR town zone
A pumped rising main fills an 18 m staged ESR that serves a looped 36-junction zone of about 8000 people at 135 lpcd. Units: SI (L/s, m, mm).
Teaches: Tank level controls, 3-point pump curve, Looped network, Daily demand pattern, CPHEEO 17 m residual.
- Run it and animate the day: watch the ESR level follow the demand pattern, and the pump that is controlled by that level.
- Open Report > CPHEEO Compliance... and compare Minimum 17 m (M24) with Target 21 m (M24 upper end, A23).
- Open Report > Pump Curve...: the curve has three points but the first is not at zero flow, so EPANET joins them with straight lines. The window explains this.
JJM gravity village
A hill source feeds a ground service reservoir by gravity, then a branched village network for about 1500 people at 55 lpcd. Units: SI (L/s, m, mm).
Teaches: Gravity main, Branched network, PRV for a low hamlet, Rural peak factor 3.
- Colour the links by Unit Headloss: most head is spent on the gravity main, where no house is connected.
- Select the PRV and change its Setting to see the lower hamlet's pressures follow.
- Check compliance with the Rural (JJM / A23) rule set.
Pumped rising main
A raw water intake with duty and standby pumps lifts water through a 6 km DI rising main to a balancing tank. Units: SI (L/s, m, mm).
Teaches: Duty and standby pumps, Check valve on discharge, Rising main profile, Pump operating point.
- Open Report > Pump Curve... for P1 and find the operating point.
- Draw a Profile Plot of head along the rising main to see where the head is lost.
- Open the standby pump P2 (set Initial Status to Open) and close P1 to model a changeover.
EPA Net1
EPANET's own first example: a pumped source, one tank and nine junctions, with chlorine decay. Units: US (GPM, ft, in).
Teaches: EPANET basics, Water quality, Pump controls.
- Colour the nodes by Quality to follow chlorine decay through the day.
- Read the pump controls in the Browser: Data tab, Controls.
EPA Net3
EPANET's larger example: two sources, three tanks and two pumps over 97 junctions. Units: US (GPM, ft, in).
Teaches: Multiple sources, Source tracing, Larger network.
- Use a larger network to practise View > Find..., View > Query... and Select Region.
- See how two sources and three tanks share the supply over a day.
Large real network (Net6)
A real utility network of 3,356 nodes and 3,892 links with 34 tanks, pumps and PRVs, from the US EPA WNTR examples (Watson, Murray and Hart, 2009). Units: US (GPM, ft, in).
Teaches: Performance at scale, Many tanks and PRVs, 4-day run.
Kentucky KY10
A real Kentucky utility network of 935 nodes in state-plane coordinates, from the University of Kentucky benchmark set distributed with US EPA WNTR. Units: US (GPM, ft, in).
Teaches: Real coordinates, Pumps, PRVs and check valves, Snapshot run.